EMCOR Services Betlem offers professional commercial and industrial heating and air conditioning design, construction, and service.
Our team includes more than 80 trained HVAC specialists with countless years of combined field experience. They’re backed by a fleet of stocked service vehicles to help ensure prompt on-site diagnosis and maintenance.
With a licensed professional engineer on staff, we can design and build HVAC systems that meet even the most demanding facility requirements. Design-build helps us improve quality, minimize costs, and avoid a number of inefficiencies created by the traditional design-bid-build process.
Our teams have experience working for a variety of clients, including supermarkets, transportation companies, institutional and governmental organizations, industrial refrigeration warehouses, and more. Our expertise also extends to specialized equipment such as environmental chambers, warm boxes, and ultra-low temperature equipment.
After installation, we offer a variety of preventive maintenance and on-call service agreements to help keep your system running optimally.
We also provide custom sheet metal fabrication and HVAC ductwork out of a fully equipped shop. In-house fabrication helps us expedite installation times while providing greater quality control.
Our teams of experienced craftsmen can fabricate, install, and service a variety of systems, including air handling, exhaust, dust collection, and more.
Reach out today to learn more about our commercial and industrial HVAC solutions.
Tenant Build-Out Project Highlight
When a large law firm needed to expand and modernize its offices, they called on Gibson Electric for a complete package of electrical contracting services.
During the project, we installed a complete structured-cable system, the highlight of which was a data center build-out and riser providing high-speed interconnectivity to the rest of the office suites.
The facility’s two floors worth of data center space features:
Throughout the entirety of the project, Gibson Electric maintained our client’s strict move-in schedule. The remaining 25-floor build-out included: